- Home
- Light Science
- Lighting requirements
Light Science
Greenhouse lighting requirements and design
Greenhouse lighting starts from three things: the daily light the crop needs, the daylight the greenhouse receives each month, and the longest day the crop tolerates. This page gives these values for each crop and the order in which a design proceeds.
By crop
Light targets
Values from the literature; they vary with cultivar, season and growing system.
| Crop | DLI range | Target DLI | Supplemental PPFD | Light hours (typical / maximum) |
|---|---|---|---|---|
| Tomato | 20–30 | 25 | 100–300 | 16 / 18 |
| Sweet pepper | 20–30 | 22 | 80–220 | 18 / 20 |
| Cucumber | 20–30 | 25 | 100–250 | 18 / 20 |
| Strawberry | 12–25 | 20 | 70–280 | 16 / 18 |
| Lettuce | 12–17 | 14 | 160–300 | 16 / 24 |
| Spinach | 14.0–17.3 | 15 | 250–400 | 12 / 13 |
| Basil | 9.3–17.8 | 12.9 | 160–310 | 16 / 18 |
| Microgreens | 6–18 | 12 | 100–600 | 16 / 18 |
| Vegetable seedlings | 10–20 | 14 | 50–200 | 16 / 18 |
The limit on light hours
A crop’s DLI can be given over longer hours at a lower PPFD, which needs fewer luminaires. The crop sets the limit: the maximum hours in the table above are the longest day each crop tolerates without damage or early flowering.
In strawberry and dragon fruit, light is also used to steer flowering: a few hours in the middle of the night at very low intensity — strawberry 0.5–3.0 µmol/m²/s, dragon fruit 1.6–4.4 µmol/m²/s, 4 hours a night. Literature
Uniformity
Uniformity is the lowest PPFD at the plants divided by the average (min/avg). Low uniformity means plants in the same greenhouse grow at different rates. It depends on the spacing of the luminaires against their mounting height, the edge rows and the parts of the structure that cast shade.
In the site’s example glasshouse model the uniformity is 0.89 at an average of 199 µmol/m²/s. Simulation
Design
The order of a lighting design
Daylight
The daylight the greenhouse receives each month, from its location and its cover: Sun and daylight, Your greenhouse.
Target and hours
The difference between the crop’s DLI target and the daylight is the share the lamps must give; the hours are chosen within the crop’s limit: PPFD and DLI calculator.
PPFD and luminaires
The PPFD needed is turned into a number of luminaires and an electrical load from the photon output and efficacy of the luminaire.
Layout and uniformity
Position, height and row spacing of the luminaires set the light at the plants; the digital twins show it.
Operation
The lamps run each day by the weather: longer on dull days, shorter on bright ones: The next 15 days.
Measurement
PPFD is measured at the plants before and after installation and compared with the design: Measurement and validation.
Discuss your project
Crop, location, structure and what is already installed are enough to begin. We reply with the questions that shape the lighting design and an outline of what we would calculate and measure.