Tomato rows in a glass greenhouse at blue hour; red and blue horticultural light from linear luminaires above the rows.

Intro film. The Sun appears in dark space; the view moves towards Earth, a small dot in the distance, and descends through the clouds into a valley with greenhouses, a dairy farm and a town. Sunlight reaches Earth in 8 minutes 20 seconds. In these 8 minutes 20 seconds, the world produces about 3,000 tonnes of tomatoes, 1,390 tonnes of cucumbers, 910 tonnes of aubergines, 710 tonnes of peppers and 170 tonnes of strawberries. In the same time, about 28.1 million eggs and 12.3 million litres of cow’s milk are produced. In this time, on average 47 million people wake up around the world. Ours arrives from 3 metres in 10 nanoseconds. We design when it arrives, how much arrives and in which colour. WONE Lighting, Flora · Fauna · Human, Lighting Engineering. Space imagery: NASA.

WONE Lighting

Lighting engineering for flora, fauna and humans

We provide light plans, digital twins and measurement for greenhouses, and are developing the same engineering chain for poultry houses, barns, fish farms and the spaces people live in.

Engineering chain
  1. InputsCrop, location, greenhouse structure
  2. Target valuesDLI · mol/m²/day
  3. Model / digital twinGreenhouse twinService
  4. MeasurementPPFD and spectrum at the canopyService
  5. ControlProgramme via the climate computerService
  6. RecordsMeasurement report and handover recordService

View Horticultural Lighting

Application areas

Three application groups: flora, fauna and humans

In every area the target value is defined where the light arrives: at the canopy for plants, at the eye and the skin for people, at eye level for animals, and in the cage and tank volume for aquaculture. The target quantity and its unit change from area to area; the model, measurement, control and record steps are the same in every area.

Tomato rows in a glass greenhouse with linear LED luminaires above the rows.

FloraService

Horticultural Lighting

Crop-specific light plans, digital twins, control concepts and measurement for greenhouses, vertical farms and propagation. The target value is the daily light integral at the canopy (mol/m²/day).

Fauna

Lighting systems for animals

Light programmes, models and measurement for meat and egg production in poultry, meat and milk production in cattle, sheep and goats, and broodstock and cage farming of marine fish. The target value is defined at the animal’s eye level in poultry houses and barns, and in the cage and tank volume in aquaculture.

  • Livestock and Poultry LightingHours of light, uninterrupted darkness, illuminance at eye level and UV-B dose in poultry houses and barnsConcept
  • Aquaculture LightingLight programmes in cages and tanks, broodstock light calendar and underwater light measurementConcept
Light and dark hoursLiterature

Literature. Broilers 18 h light / 6 h dark, laying hens in production 16 / 8, dairy cows 16 / 8 in lactation and 8 / 16 in the dry period.

Human

Lighting systems for people

Across the five areas, the target quantities are melanopic EDI at eye level, the UV dose reaching the skin and the temporal modulation of the luminaire.

  • Sleep and Wake LightingEvening light, night darkness and a morning ramp in one programmeConcept
  • Vitamin D and UV-BVitamin D2 line for mushrooms, vitamin D winter and a UV-B light engine
  • Bright LightHigh illuminance at eye level and an all-day room programmeConcept
  • UV and InfraredDose for night-time UV, far-red, red and near-infrared
  • Flicker and PhotosensitivityFlicker and flash measurement across the dimming range and under fault conditionsConcept

Model and measurement

Digital twin and measurement in horticultural lighting

The models we offer as a service today are for greenhouses and grow rooms. Dimensioned geometry, luminaire layout, the light reaching the crop, programme and energy are calculated in one model; after installation, the light measured at canopy height is compared with this model.

Calculation model: tomato rows, toplightingSimulation
PPFD at the top of the crop µmol/m²/smin 178avg 199160180200220240Tomato rowToplightPath between rows (shown faded)
Average PPFD
199µmol/m²/s
DLI from the luminaires, 18 h
12.9mol/m²/day
Power density
77W/m²

Simulation. The map shows toplighting only, without daylight or shading.

A light sensor at canopy height between lettuce rows; rows of LED luminaires above.

Model

Options are compared before anything is ordered: mounting height, number of luminaires, programme and energy.

Open the digital twins

Measurement

The light map and the spectrum are measured with calibrated instruments before and after installation; lamps and daylight are recorded separately.

Measurement and validation

ConceptThe models for poultry houses and barns, cages and tanks, rooms and the mushroom line use the same calculation engine.

View the engineering chain

How we work

Projects, measurement and co-development

We work in three ways: project engineering for operations planning a lighting installation, measurement for those who want an existing system or device verified, and co-development for device manufacturers and research groups.

Project engineering

Light plan, digital twin, control concept and commissioning. Installation is carried out by licensed electrical contractors.

Measurement and verification

Light and dose measurement at the canopy, at eye level, at animal eye level, under water or at the product surface; the result is set against the design.

Co-development

Calibrated light engines and measurement protocols for device manufacturers and research groups. Versions for medical use are developed with the legal manufacturer and clinical partners.

Concept

Discuss your project

The space, its location and the system you use today are enough to begin. In our reply we set out which values we would calculate and measure, and the first step.