1. WONE Lighting
  2. Engineering

Engineering

Lighting engineering chain

The engineering chain we apply in horticultural lighting projects, and are developing for the other areas, has six steps. The target value is defined where the light arrives; the model calculates it before installation, measurement verifies it on site, the control programme applies it to the luminaire, and the result is recorded.

Where the target value is defined

Target value

Where the target value is defined

The effect of light is defined at the surface it reaches, by a quantity weighted for the receptor at that surface. Each area therefore has its own target quantity and unit; besides the instantaneous value, duration and dose are part of the target.

Literature
AreaWhere the light arrivesInstantaneous quantityDuration and dose
Horticultural LightingCanopy; after harvest, the product surfacePPFD (µmol/m²/s), spectral ratiosDLI (mol/m²/day), photoperiod (h)
Livestock and Poultry LightingThe animal’s eye level; for UV-B, the skinIlluminance (lx), share of the area lit (%)Light and dark hours, uninterrupted darkness (h), daily UV-B dose (kJ/m²)
Aquaculture LightingCage and tank volume, under waterUnderwater irradiance (W/m²) and spectrum, share of the cage volume that receives light (%)Seasonal photoperiod calendar (h), light leakage during the dark period
Sleep and Wake LightingEye, in the vertical planeMelanopic EDI (lx)Evening, night and morning windows (h)
Vitamin D and UV-BSkin; for mushrooms, the product surfaceVitamin D-effective and erythemally weighted irradiance (W/m²)Dose (kJ/m²), uniformity
Bright LightEye, at a stated distanceIlluminance at the eye (lx), melanopic EDI (lx), surface luminance (cd/m²)Daily profile
UV and InfraredCanopy, product surface, application planeWeighted irradiance (W/m², mW/cm²), ePAR (µmol/m²/s)Dose (J/m², J/cm², kJ/m²)
Flicker and PhotosensitivityEye, visual fieldModulation (%)Frequency (Hz), flashes per second
PPFDµmol/m²/sPhotosynthetic photons reaching each square metre of the canopy per second, 400–700 nm
DLImol/m²/dayTotal photosynthetic photons reaching each square metre of the canopy in one day
Melanopic EDIlxDaylight-equivalent illuminance, weighted for the melanopsin response of the eye
IlluminancelxLight weighted for the sensitivity of the human eye; poultry and livestock regulations are written in this unit
Weighted UV dosekJ/m²UV irradiance weighted by an action spectrum and summed over the exposure time
Modulation%Depth of the fluctuation in light output within one period

Inputs

Inputs and target values

Inputs

Every calculation starts from four groups of information: the geometry and interior surfaces of the space the light falls on; location and date, that is, the share that daylight provides at that place in that month; the plant, person, animal or product the light is for, and its stage; and the installed luminaires and control system. The details of the inputs are on the area’s system page.

Target values

A target value comes from the regulation in force, from published research or from a calculation for the product and the application. A regulatory value is the lower limit of the design. Research usually reports a range; the value that suits the operation’s conditions is chosen from that range. A value calculated for a luminaire carries the Simulation label until it is measured.

ApplicationTarget valueLabel
Broiler houseRegulatory value: at least 20 lx at the animals’ eye level over at least 80% of the usable area; at least 6 h of darkness in 24 h, at least 4 h of it uninterrupted. This is the lower limit of the design.Literature
Lactating dairy cow16–18 h of light and 6–8 h of uninterrupted darkness a day; a range reported in research, chosen to suit the operation’s conditions.Literature
Night-break lighting in dragon fruitThe target value is the PPFD on the stem that receives the least light; the light plan is built on the value calculated at that point.Simulation
120 cm linear photoperiod luminaireAt 34 W input, 65 µmol/s for 400–700 nm and 42 µmol/s for 700–780 nm; calculated values.SimulationEngineering development

Model and digital twin

Model and digital twin: space, luminaires, the surface the light reaches, and programme

Before installation, the model calculates the target value at the surface the light reaches, so that options can be compared before anything is ordered. It has four layers.

  1. Space

    Dimensioned geometry: compartments, benches and racks; poultry house and barn pens, cage tiers; fish cages and tanks; rooms; conveyors and trays. The reflectance of interior surfaces is included.

  2. Luminaires

    Every luminaire at its true position and mounting height, with its own light distribution and spectrum.

  3. The surface the light reaches

    Canopy, eye position, animal eye level or product surface; in aquaculture, the cage and tank volume. Values are read only on this surface or in this volume; paths and walls appear on the map and stay out of the statistics.

  4. Programme

    Operating hours, dimming and the month’s daylight; turns the instantaneous value into a daily total, a dose and energy.

Four layersSimulation
001224Programme24 hLuminairesposition and heightThe surface the light reachesSIMULATIONSpacegeometry and interior surfaces001224

Simulation. The surface layer is the calculation engine’s output for the horticultural demonstration model: a 24 × 12.8 m section with 8 tomato rows; the other layers are drawings.

Three levels

Level 1

3D visualisation

Shows the space and the equipment; it calculates nothing.

Level 2

Engineering simulation

Calculates light distribution, daily total, dose and energy from stated inputs and assumptions.

Level 3

Operational digital twin

A simulation connected to the sensors and control system of a real installation and updated with measured data. None of today’s demonstrations is connected to a real site.

The models running today are for horticultural lighting: six demonstration models and the daily light and energy calculations. The calculation engine was compared with an independent lighting simulator in six reference rooms. The poultry house and barn model, the cage and tank model, the room model and the dose map for the mushroom line use the same engine.

  • ServiceHorticultural model
  • Engineering developmentVitamin D winter atlas and far-red ePAR planning
  • ConceptOther models
A glass greenhouse at dusk, lit from inside by red and blue horticultural light.

Tools and digital twins

Digital twins and the light recipe card

Measurement

Shared measurement infrastructure

Light is measured where the target value is defined, in the quantity that suits the area, and the result is compared with the model. Every report states the instrument, the calibration date, the measurement points and the difference from the design.

Measurement lineWhat is measuredUsed inStatus
Light at the canopyPPFD and spectrum, before and after installation; lamps and daylight separately; far-red reported apart from PARHorticultural LightingService
Light at eye levelSpectrum, illuminance and melanopic EDI at the eye position; luminance mapSleep and Wake Lighting, Bright LightConcept
Light and night darkness at animal eye levelIlluminance grid at eye level, share of the area lit, light leakage during the dark periodLivestock and Poultry LightingConcept
Underwater lightIrradiance and spectrum by depth in the cage and tank volume; light leakage in the tank during the dark periodAquaculture LightingConcept
UV and infrared irradianceSpectral irradiance 250–1100 nm, weighted dose, uniformity, wavelength shift with temperatureVitamin D and UV-B, UV and Infrared, Livestock (UV-B)Concept
Temporal measurementLight modulation at every dimming level, at switch-on, at scene changes and under fault conditions; 0.5 Hz–20 kHzFlicker and Photosensitivity; WONE luminaires in developmentConcept
Photobiological safetyRisk group to IEC 62471, with the measurement distanceUV and the areas for peopleConcept
Measurement ranges

Measurement range3–60 HzLiteratureUVFar-red and near-infrarednm · Hz

Control

Control: programme, dimming, dose control and interlocks

The target value is turned into a 24-hour programme and applied to the luminaire channel by channel. The programme is set up together with the operation’s climate computer or building control system.

24-hour programmeLiterature

Watch the control film

  • Programme and dimming

    Photoperiod, day extension and night interruption; dawn and dusk dimming; programmes that change with age, stage or time of day.

  • Climate-computer link

    Service

    In greenhouses, zoning, dimming and switching are worked out with the grower’s climate-computer supplier.

  • Greenhouse automation

    Engineering development

    Ventilation, thermal and shade screens, heating and frost protection managed together with supplemental light, based on the outdoor weather forecast and current conditions.

  • Dose control and interlocks

    Concept

    Irradiance and exposure-time control on UV channels; dose tied to line speed; interlocks when a person enters or a cover is opened.

  • Flicker and flash limits

    Concept

    Temporal limits at every dimming level and scene change; under fault conditions, a steady dimmed or off state instead of periodic flashing.

Records

Records, evidence labels and status

The record shows which settings the delivered system runs with and what results it gives: programmes, measurement results, the difference between model and measurement. In UV applications the dose per batch or per day, in poultry houses and barns the dark hours, in cages and broodstock tanks the daily light programme, and for light engines the per-unit measurement table and calibration certificate are part of the record link.

Measured

Recorded with a stated instrument, method and date at a real installation or in a laboratory.

Simulation

Calculated by our model from stated inputs. Shown with its assumptions.

Literature

Reported in published research or official sources.

Concept

Systems, products and illustrations not yet built or measured.

  1. Concept
  2. Engineering development
  3. Prototype
  4. Laboratory measured
  5. Field validated
  6. Commercially available

The design, measurement and control services we provide in horticultural lighting carry the “Service” label.

Systems and products without the Service label are in development and are not offered for sale.

Light recipe card: the result of a tool on one page, with its evidence labels

By area

The six links by area

The steps of the chain are the same in every area; from area to area, the inputs, the target quantities and the place of measurement change. Linked rows lead to the area’s system page.

AreaInputsTarget valuesModel / digital twinMeasurementControlRecords
Horticultural LightingCrop and growth stage; greenhouse, rack or propagation bench geometry; cover; location and daylightPPFD, DLI, photoperiod, spectrum, uniformityGreenhouse, rack and propagation bench twin; monthly DLI and energyPAR and spectrum at the canopyPhotoperiod and supplemental light programme, dimming, climate-computer linkMeasurement report and handover record; difference between model and measurement
Livestock and Poultry LightingSpecies, line, age and stage; poultry house and barn geometry, interior surfaces; windows, curtains and fans; locationIlluminance and area share at eye level, light and dark hours, uninterrupted darkness, spectrumPoultry house and barn model: illuminance map, vertical illuminance on cage tiers, light leakage in the darkGrid survey, night darkness measurement, flicker and spectrumProgramme by age and stage, dawn and dusk dimming, climate-computer linkLog of dark hours and illuminance, kept with the flock and herd records
Aquaculture LightingSpecies and stage, target spawning period; cage or tank geometry, water depth and turbidity; location and dateSeasonal photoperiod calendar, share of the cage volume that receives light, light leakage during the dark periodCage and tank model: underwater irradiance distribution, seasonal calendarUnderwater irradiance and spectrum, light leakage into the tank in the darkCalendar per cage or tank, dawn and dusk dimmingProgramme and fault hours per cage and broodstock group
Sleep and Wake LightingCity and season, wake-up and bed times, age range, room, window and luminairesMelanopic EDI at eye level: low in the evening and at night, high at the end of the morning rampBedroom model: light at the eye position, hour by hourSpectrum and melanopic EDI at the eye position, flickerEvening scene, night mode, morning rampMeasurement table per unit; weekly trend kept on the device
Vitamin D and UV-BProduct form and line geometry; exposed skin area of the animal; city and month; source spectrumUV dose and uniformity at the surface; vitamin D-effective and erythemally weighted dose, kept separateDose map on the conveyor and in the poultry house; atlas by city and monthSpectral irradiance 280–400 nm, weighted dose, uniformityIrradiance control tied to line speed, exposure time, person and eye interlocksDose record per batch or per day; spectral certificate per unit
Bright LightPanel size, distance, head angle, spectrum, room and windowIlluminance and melanopic EDI at the eye; surface luminance limitEye-level model; daily profile in the roomIlluminance and melanopic EDI at the eye at a stated distance, uniformity, IEC 62471 risk groupAll-day room programmeDelivered illuminance and melanopic dose; commissioning report
UV and InfraredApplication, wavelength, target surface, distance, LED junction temperatureWeighted irradiance and dose; ePARDose map at the canopy and the product surfaceSpectral irradiance 250–1100 nm, traceable calibration, wavelength shift with temperatureDose control per channel, night window and interlocksDose record per night or per batch; calibration certificate per unit
Flicker and PhotosensitivityLuminaire, driver, dimming method, scene changes, visual fieldModulation, flash rate and flash area in the 3–60 Hz bandMap of the flash area in the roomTemporal measurement at every dimming level, at switch-on, at scene changes and under fault conditionsFlash limiter, steady state under fault conditionsFlicker data sheet per product, test report
Horticultural Lighting
Inputs
Crop and growth stage; greenhouse, rack or propagation bench geometry; cover; location and daylight
Target values
PPFD, DLI, photoperiod, spectrum, uniformity
Model / digital twin
Greenhouse, rack and propagation bench twin; monthly DLI and energy
Measurement
PAR and spectrum at the canopy
Control
Photoperiod and supplemental light programme, dimming, climate-computer link
Records
Measurement report and handover record; difference between model and measurement
Horticultural Lighting
Livestock and Poultry Lighting
Inputs
Species, line, age and stage; poultry house and barn geometry, interior surfaces; windows, curtains and fans; location
Target values
Illuminance and area share at eye level, light and dark hours, uninterrupted darkness, spectrum
Model / digital twin
Poultry house and barn model: illuminance map, vertical illuminance on cage tiers, light leakage in the dark
Measurement
Grid survey, night darkness measurement, flicker and spectrum
Control
Programme by age and stage, dawn and dusk dimming, climate-computer link
Records
Log of dark hours and illuminance, kept with the flock and herd records
Aquaculture Lighting
Inputs
Species and stage, target spawning period; cage or tank geometry, water depth and turbidity; location and date
Target values
Seasonal photoperiod calendar, share of the cage volume that receives light, light leakage during the dark period
Model / digital twin
Cage and tank model: underwater irradiance distribution, seasonal calendar
Measurement
Underwater irradiance and spectrum, light leakage into the tank in the dark
Control
Calendar per cage or tank, dawn and dusk dimming
Records
Programme and fault hours per cage and broodstock group
Sleep and Wake Lighting
Inputs
City and season, wake-up and bed times, age range, room, window and luminaires
Target values
Melanopic EDI at eye level: low in the evening and at night, high at the end of the morning ramp
Model / digital twin
Bedroom model: light at the eye position, hour by hour
Measurement
Spectrum and melanopic EDI at the eye position, flicker
Control
Evening scene, night mode, morning ramp
Records
Measurement table per unit; weekly trend kept on the device
Vitamin D and UV-B
Inputs
Product form and line geometry; exposed skin area of the animal; city and month; source spectrum
Target values
UV dose and uniformity at the surface; vitamin D-effective and erythemally weighted dose, kept separate
Model / digital twin
Dose map on the conveyor and in the poultry house; atlas by city and month
Measurement
Spectral irradiance 280–400 nm, weighted dose, uniformity
Control
Irradiance control tied to line speed, exposure time, person and eye interlocks
Records
Dose record per batch or per day; spectral certificate per unit
Bright Light
Inputs
Panel size, distance, head angle, spectrum, room and window
Target values
Illuminance and melanopic EDI at the eye; surface luminance limit
Model / digital twin
Eye-level model; daily profile in the room
Measurement
Illuminance and melanopic EDI at the eye at a stated distance, uniformity, IEC 62471 risk group
Control
All-day room programme
Records
Delivered illuminance and melanopic dose; commissioning report
UV and Infrared
Inputs
Application, wavelength, target surface, distance, LED junction temperature
Target values
Weighted irradiance and dose; ePAR
Model / digital twin
Dose map at the canopy and the product surface
Measurement
Spectral irradiance 250–1100 nm, traceable calibration, wavelength shift with temperature
Control
Dose control per channel, night window and interlocks
Records
Dose record per night or per batch; calibration certificate per unit
Flicker and Photosensitivity
Inputs
Luminaire, driver, dimming method, scene changes, visual field
Target values
Modulation, flash rate and flash area in the 3–60 Hz band
Model / digital twin
Map of the flash area in the room
Measurement
Temporal measurement at every dimming level, at switch-on, at scene changes and under fault conditions
Control
Flash limiter, steady state under fault conditions
Records
Flicker data sheet per product, test report

Link status

Inputs and target values are information links and carry no status. Today’s status of the model, measurement, control and record links, by area:

Link status

ServiceEngineering developmentConcept

Show as table
AreaModelMeasurementControlRecords
Horticultural LightingServiceServiceClimate-computer link: Service · Greenhouse automation: Engineering developmentHandover record: Service · Comparison record of model and measurement: Concept
Livestock and Poultry LightingConceptConceptConceptConcept
Aquaculture LightingConceptConceptConceptConcept
Sleep and Wake LightingConceptConceptConceptConcept
Vitamin D and UV-BVitamin D winter atlas: Engineering development · Dose map: ConceptConceptConceptConcept
Bright LightConceptConceptConceptConcept
UV and InfraredFar-red and ePAR planning: Engineering development · others: ConceptConceptConceptConcept
Flicker and PhotosensitivityConceptConceptConceptConcept

Dose and programme

Systems that run on a measured light dose or programme

In these applications light is defined by four pieces of information: the measured dose or programme, the time window in which it is applied, the result measured in the product or the animal, and the record that matches the dose to that result. Dose, programme and record are part of the engineering chain; the result is measured in the producer’s laboratory or tracked in the operation’s records.

SystemMeasured dose or programmeTime windowMeasured resultRecordStatus
Day length and winter supplemental light in strawberryNight interruption and day extension programme; daily light integral of the supplemental lightWinter and early springFlowering and runner formation, from the grower’s recordsProgramme and measurement reportService

Discuss your project

The space, its location and the system you use today are enough to begin. From device manufacturers we ask for the wavelength, the application plane and the target irradiance.